10 October 2015

Jumbo block between Churchgate and Mumbai Central

To carry out maintenance work of track, signaling & overhead equipments, jumbo block of five hours will be under taken between Churchgate and Mumbai Central (Local) stations from 10.35 hrs to 15.35 hrs o­n UP & Dn local (i.e. slow corridor) lines o­n Sunday, 11th October, 2015.

          During the block period, all Up and Down slow line trains will run o­n through lines (i.e. fast corridor) between Churchgate and Mumbai Central Local stations. Passengers are requested to take note of the above arrangements.

To carry out maintenance work of track, signaling & overhead equipments, jumbo block of five hours will be under taken between Churchgate and Mumbai Central (Local) stations from 10.35 hrs to 15.35 hrs o­n UP & Dn local (i.e. slow corridor) lines o­n Sunday, 11th October, 2015.

          During the block period, all Up and Down slow line trains will run o­n through lines (i.e. fast corridor) between Churchgate and Mumbai Central Local stations. Passengers are requested to take note of the above arrangements.

Follow by Email